Menu
Search
Calf Robe Bridge Temporary Abutment Stabilization  | PLAXIS Real-Life Projects

Online

Online
  • 28th October 2021
    12:00 pm - 1:00 pm

North American firm GeoStabilization International used PLAXIS 2D for a 2D soil-structure interaction project. The model includes existing H-Pile sections at the bridge abutment. These elements were modelled as embedded beam rows.

The concrete occupying the bridge deck and abutment was modelled with the concrete constitutive model in PLAXIS 2D. The shoring system was modelled as two elements: ground anchors as embedded beams and reinforced shotcrete as plates.

Further, the model included drilled shafts which were modelled as embedded beam elements. To determine ultimate moment capacity of the shaft, as designed and installed by GSI, they used PLAXIS 3D to perform a pushover analysis.

The shaft rebar cage was modelled with beam elements and the concrete volume for the shaft was modelled with the concrete constitutive model.

 

 

Location

Venue:  

Address:
Online

Description:
Details on how to join the webinar will be emailed to you once registered.

Numerical Analysis of Seepage and Stability of a Tailings Dam

Registration / Further Information

Please refer to our Privacy Policy regarding how we may process any personal data you submit within this form.

© 2024 Wilde Analysis Ltd.

Web design and hosting by BFI®